This page helps to understand the issue where Effort Complexity total displayed in the AEP Detail report in TCC is not matching with the manual calculation.
You can see from below image that the EC total should be 1.05 + 1.00 + 1.15 + 413.78 = 416.98
But the EC total is mentioned as 415.98 in the above report
Release | Yes/No |
---|---|
8.3.x | |
8.2.x |
RDBMS | Yes/No |
---|---|
Oracle Server | |
Microsoft SQL Server | |
CSS3 | |
CSS2 |
- Launch TCC
- Navigate to Enhancement View
If you observe the EC Total value is not matching the manual calculation then please check the below points:
- This is not a bug since the number of EC Deleted is not considered in the count of EC TOTAL . For example, In above report,
So, EC Total would be ( Excluding EC Deleted as per the functionality): EC Added+ EC Updated + EC Unchanged = 0.18+2.55+413.20=415.98 as displayed in the report.
2. If the above steps do not solve your issue contact CAST Technical Support. with the following Relevant input
Relevant input
- CAST Support Tool (CST) - alias Sherlock export with the following options Export CAST Bases with Management Base, Knowledge Base, Central base
- Screenshot of the issue
Ticket # 26098