Purpose (problem description)

This page helps to understand the issue where Effort Complexity total displayed in the AEP Detail report in TCC is not matching with the manual calculation.

            


             You can see from below image that the EC total should be 1.05 + 1.00 + 1.15 + 413.78 = 416.98
             But the EC total is mentioned as 415.98 in the above report

Observed in CAST Version, CAST Extension Version, CAST Component Version


Release

Yes/No

8.3.x(tick)
8.2.x(tick)
Observed in RDBMS

RDBMS

Yes/No

Oracle Server (error)
Microsoft SQL Server (error)
CSS3(tick)
CSS2 (tick)
Step by Step scenario
  1. Launch TCC
  2. Navigate to Enhancement View
Action Plan

If you observe the EC Total value is not matching the manual calculation then please check the below points:

  1. This is not a bug since the number of EC Deleted is not considered in the count of EC TOTAL . For example, In above report,

           

          So, EC Total would be ( Excluding EC Deleted as per the functionality): EC Added+ EC Updated + EC Unchanged = 0.18+2.55+413.20=415.98 as displayed in the report.

     2. If the above steps do not solve your issue contact CAST Technical Support. with the following Relevant input 

 

Relevant input

Notes/comments

Ticket # 26098

Related Pages